CR-01 · 10T Overhead Crane
Lifting · Workshop Bay 1 · Konecranes · S/N KON-10T-55821
Status
Overdue· 65 days overdue
Next inspection due
11 Sept 2026
Every 12 months · last 11 Sept 2025
Start preparing by
12 Aug 2026
30 days lead time for quotes & booking
Spend on record
SGD 7,132.00
4 service records
Vendor: LiftSafe Engineering Pte Ltd · sales@liftsafe.example
Annual thorough examination + load test by Authorised Examiner (WSH).
Service history
| Date | Work | Vendor | Cost |
|---|---|---|---|
| 09 Jan 2026 | repair Replaced hoist brake pads and upper limit switch | LiftSafe Engineering Pte Ltd | SGD 2,380.00 |
| 11 Sept 2025 | inspection Latest service on record | LiftSafe Engineering Pte Ltd | SGD 1,485.00 |
| 11 Sept 2024 | inspection | LiftSafe Engineering Pte Ltd | SGD 1,584.00 |
| 11 Sept 2023 | inspection | LiftSafe Engineering Pte Ltd | SGD 1,683.00 |
| Total | SGD 7,132.00 | ||
Documents on file (7)
- CR-01_repair_invoice_2026-01.pdfInvoiceINV-LSE-62282 · 09 Jan 2026 · SGD 2,380.00
- CR-01_inspection_certificate_2025-09.pdfInspection / Load Test CertLSE-INS-2509-1001 · 11 Sept 2025 · next due 11 Sept 2026
- CR-01_invoice_2025-09.pdfInvoiceINV-LSE-04066 · 11 Sept 2025 · SGD 1,485.00
- CR-01_inspection_certificate_2024-09.pdfInspection / Load Test CertLSE-INS-2409-1003 · 11 Sept 2024 · next due 11 Sept 2025
- CR-01_invoice_2024-09.pdfInvoiceINV-LSE-22206 · 11 Sept 2024 · SGD 1,584.00
- CR-01_inspection_certificate_2023-09.pdfInspection / Load Test CertLSE-INS-2309-1005 · 11 Sept 2023 · next due 11 Sept 2024
- CR-01_invoice_2023-09.pdfInvoiceINV-LSE-20404 · 11 Sept 2023 · SGD 1,683.00